· Plan and execute the ESD/FGS/HIPPS requirements associated with pre-SAT readiness activities, Site Acceptance Test (SAT), SAT punch list close out and commissioning.
Implement site/tie-in activity modification in ESD/FGS/HIPPS system based on approved design documents Supervise and get existing system/marshalling/Network/PDB cabinet modified based on approved design documents Capture all changes as red mark on approved design documents Preparing site reports Be proactive in approach, follow the procedure and be part of a wider team Any issues shall be immediately reported and discussed with the espective lead at site / back office. · Resolve any unexpected technical difficulties and other problems that may arise.
Shall be flexible in work timings as the job is on site and is critical in nature. Shall abide by the site processes in terms of permits, safety requirements. · Oversee quality contro...