Found Description
Description
s. Preparation of Signal list, trip matrix, Logics & Interlocks.Review of Vendor drawings and documents (technical vetting of Control & Relay panels, Auxiliary System).
Preparation of schematic diagrams for the interface’s equipment in Control & Relay Panel scheme thus providing completeness.
Preparation of relay ordering information and circuit diagrams – New & Existing Set-up (applicable for retrofit projects), Cable block diagram and Cable Schedule & BoQ estimation for ordering
Preparation of Wiring/Termination diagrams, Core sheets, SCS IO Schedule. Panel Engineering Expertise (Layouts, circuit diagram, wiring table, terminal table etc.,).
Preparation of Voltage drop calculation - Trip & Close coil, LVAC power cable. Identification of existing drawings and modifying them using Red and Green markups as per standard requirements
Interface knowledge with Primary Equipment...
Ready to Apply?
Submit your application for Project Engineer Secondary Design at Hitachi Rail
Apply Now