Found Description
What is the Opportunity?
The Shoreline Power Group is a fully integrated Joint Venture of Aecon and AtkinsRéalis located in Kincardine, Ontario. Shoreline Power Group is the centerpiece of the Major Component Replacement (MCR) program which replaces the main components of 6 reactors at the Bruce Power Nuclear Generating Station. The scope of work includes the removal and replacement of calandria tubes, pressure tubes, and feeders as well as construction management and trade labor. This project is part of Bruce Power’s Life Extension Program, which will allow Bruce Power’s CANDU units to continue to operate safely through to 2064.
Reporting to the Document Control Lead, the Document Control Administrator is responsible for the processing, issuing and/or reproduction and filing of engineering and construction documents to insure accuracy and timeliness.
What You'll Do Here: